Wattvision Gateway 2 with Pulse Input Cable

This cable allows you to hard-wire a KYZ Pulse Output Meter to a Wattvision Gateway. If you would like more information on this, contact [email protected]

549

Wire the RED wire to the pulse “signal” (Y or Z) and wire the BLACK wire to the “ground” (K) on your meter’s pulse output port. Follow Gateway setup instructions, and treat the RJ11 wire (pulse wire) as the sensor.